Bergler Energie

Photovoltaics: Residential

Your roof produces your own power.

Single- or multi-family home, up to 30 kWp. Modules and inverters from leading manufacturers, optionally combined with battery and heat pump into a complete energy system.

Photovoltaic system on a single-family home

Two building types

Single- or multi-family home

Same components, different focus. We design both. The difference lies in sizing, ZEV concept and metering.

Single-family home

up to 15 kWp

Pitched, hip or flat roof. We size based on yearly consumption plus planned future loads (heat pump, EV). Mounted in about a week.

  • Typically 25 – 50 m² of module area
  • One Huawei inverter with backup option
  • Self-consumption 30 % without, 60 – 80 % with battery

Multi-family home

15 – 30 kWp

For owners and cooperatives. With a ZEV (self-consumption community) all parties share the solar power, pragmatically billed through a single metering point.

  • ZEV concept incl. metering and billing
  • Multiple strings, larger inverters
  • Integration with a central heat pump possible

Components

Our standard components for residential systems

Proven setup with components from leading manufacturers, complemented with battery and heat pump when it fits.

Modules

Longi

Premium modules with 25-year product and performance warranty. High efficiency, even in diffuse light.

Inverter

Huawei FusionSolar

Hybrid-capable, integrated monitoring via app, optional backup module.

Battery (optional)

Huawei LUNA2000 / BYD

LFP storage from Huawei or BYD. Scalable, fire-safe, 6,000+ cycles.

Heat pump (optional)

Air-to-water

Combined with PV and battery: solar power heats and makes hot water.

So arbeiten wir

From idea to your own power production

01

Consultation

Free on-site appointment. We measure the roof and your electricity consumption, discuss goals and incentives. Honestly, with no sales pressure.

02

Planning & quote

Sizing based on roof geometry, orientation, consumption profile and future load (EV, heat pump). Transparent quote with payback calculation.

03

Installation

Permitting, mounting, electrical connection and commissioning. All by our own team. For a single-family home usually within a week.

04

Commissioning & handover

Commissioning, registration with the grid operator and handover. You can view your system anytime yourself via the Huawei FusionSolar app. Ongoing maintenance and monitoring are not part of the scope.

Häufige Fragen

Frequently asked about residential systems

What does a PV system for my single-family home cost?

A typical 10 – 15 kWp system costs between CHF 25,000 and CHF 40,000 including mounting and commissioning. Cantonal incentives and one-off remuneration reduce this by a further 15 – 30 %. The quote transparently shows components, labour and payback time.

How quickly does the system pay off?

At current electricity prices and a typical consumption profile we calculate 8 – 12 years payback for an SFH system without battery, with battery 10 – 14 years. The key driver is your self-consumption share: the more you use yourself, the faster it pays off.

Does a battery make sense on top?

Without a battery, you sell surplus power back to the grid at a lower rate than you buy it. With a battery, self-consumption rises from around 30 % to 60 – 80 %. Whether it pays off depends on your consumption profile. We'll discuss the right option with you.

Does the system work during a power outage?

With a standard inverter, the system shuts down during a grid outage for safety reasons. A backup function is only possible with an additional backup module or off-grid system and is not part of the standard scope. We do not offer a true uninterruptible power supply (UPS).

Can I run PV economically on a multi-family home?

Yes, typically via a ZEV concept. All tenants receive solar power from the shared roof and pay an agreed tariff to the owner. We plan the ZEV concept, metering setup and billing model.

How long does the installation take for me?

We usually install single-family home systems within about a week. Permitting and grid connection applications are planned in advance so things run smoothly on site. Total time from contract to commissioning: typically 2 – 4 months.

Your energy project still lives in your head?

Tell us about it and we'll get back to you personally. Or call us directly: +41 81 560 20 88. Free initial consultation, transparent quote.

A personal reply on business days, straight from the team.